Project Overview:
This project consists of
improving Overland Drive, Greenview Court, Edgewood Avenue, Heitel Way, and
Towering Oaks Trail. The existing
bituminous will be reclaimed and used as aggregate base. Portions of the road will be raised with
imported gravel to increase the strength and a new 3 1/2” thickness bituminous
mat will be constructed. All driveways
will be matched to the new road if necessary.